AllTenders - Serving clients online since Jan, 2000            Sales: 9313852989, 9355399771

franchise

Liaison Support

Tenders that match your criteria


Ref. No. Active Till Name of Work Category Sub Category Country State Estimated Cost (Rs.) Details
5003609343
Not Specified EPC AM-II (48B) - Improvement to Nimgaon fata Narkhed Matargaon MDR 7 km 46/600 to 57/00 Km Total length 10 . 4 km MDR-49 SH-222 (Matargaon Budruk)-||||EPC AM-II (48B) - Improvement to Nimgaon fata Narkhed Matargaon MDR 7 km 46/600 to 57/00 Km Total length 10 . 4 km MDR-49 SH-222 (Matargaon Budruk)- INDIA MAHARASHTRA 2147027782 Details
5003609329
Not Specified EPC NAG-II (57B) - Improvement to Nanded Mudkhed Rajura Bamani Karva Junona Chichapalli Road (MSH-10) Part Karva to Junona to Chichpalli Road Ch . 245/800 to 251/500 and Ch . 256/500 to 267/500 Length-16 . 70 KM , Ballarpur Karva Road (MDR-20) Ch . 2/100 t||||EPC NAG-II (57B) - Improvement to Nanded Mudkhed Rajura Bamani Karva Junona Chichapalli Road (MSH-10) Part Karva to Junona to Chichpalli Road Ch . 245/800 to 251/500 and Ch . 256/500 to 267/500 Length-16 . 70 KM , Ballarpur Karva Road (MDR-20) Ch . 2/100 t INDIA MAHARASHTRA 1933968344 Details
5003609753
Not Specified EPC AM-II (50C) - Improvement to Parva Kelapur Shibla Ghonsa Wani Road SH-314 Ch . Km 40/000 to Km 77/500) (Length 27 . 50 Km) (Part- Shibla to Wani city) and Wadki- Khairi-Mardi- Nandepera-Wani- Chargaon-Shindola to Chandrapur border||||EPC AM-II (50C) - Improvement to Parva Kelapur Shibla Ghonsa Wani Road SH-314 Ch . Km 40/000 to Km 77/500) (Length 27 . 50 Km) (Part- Shibla to Wani city) and Wadki- Khairi-Mardi- Nandepera-Wani- Chargaon-Shindola to Chandrapur border INDIA MAHARASHTRA 2186852178 Details
5003607842
Not Specified CONSTRUCTION OF GOVERNMENT MEDICAL COLLEGE FOR 100 ADMISSIONS AND WITH 500 BEDDED MODERN TERTIARY LEVEL PATIENT CARE HOSPITAL SINDHUDURG DIST . SINDHUDURG||||CONSTRUCTION OF GOVERNMENT MEDICAL COLLEGE FOR 100 ADMISSIONS AND WITH 500 BEDDED MODERN TERTIARY LEVEL PATIENT CARE HOSPITAL SINDHUDURG DIST . SINDHUDURG INDIA MAHARASHTRA 3156031899 Details
5003609328
Not Specified EPC AU-II (63A) - Improvement to Amalner Nagad Kannad- Devgaon-Lasur-Gangapur to Kaigaon Toka road SH-39 Km 119/300 to 164/300 Tal . Gangapur Dist . Aurangabad on EPC mode||||EPC AU-II (63A) - Improvement to Amalner Nagad Kannad- Devgaon-Lasur-Gangapur to Kaigaon Toka road SH-39 Km 119/300 to 164/300 Tal . Gangapur Dist . Aurangabad on EPC mode INDIA MAHARASHTRA 2299422101 Details
5003609306
Not Specified EPC NSK-II (21B) - Improvement to Nandurbar Sakri Nampur Malegaon road MSH-08 Ch . 147/100 to 175/400 Tal . Satana Dist . Nashik on EPC mode||||EPC NSK-II (21B) - Improvement to Nandurbar Sakri Nampur Malegaon road MSH-08 Ch . 147/100 to 175/400 Tal . Satana Dist . Nashik on EPC mode INDIA MAHARASHTRA 1146821700 Details
5003601181
06-Apr-2024 DRILLING , EXCAVATION , LOADING , TRANSPORTATION , DUMPING , SPREADING & LEVELLING , ETC . , OF 573 . 798 LBCM OF IN-SITU OB (WHICH INCLUDES 1 . 179 LBCM OF TOP SOIL , 3 . 279 LBCM OF SUB SOIL , 526 . 304 LBCM OF HARD OB & 43 . 036 LBCM OF COAL) AND RE-HANDLING OF 11 . 385 LCM OF LOOSE OB WITH CONVENTIONAL EQUIPMENT AND ADDITIONAL WORKS VIZ . , 2000 SHOVEL HOURS & 1 , 65 , 000 RMT OF DRILLING AT JVR OC-II MINE , KGM AREA DURING A PERIOD OF 36 MONTHS . INDIA Telangana 3104400000 Details
5003604667
Not Specified On Turnkey Basis Construction of Talawada Dam , as per detailed scope of work but not limited to that . ||||On Turnkey Basis Construction of Talawada Dam , as per detailed scope of work but not limited to that . INDIA MADHYA PRADESH 1858822000 Details
5003609340
Not Specified EPC ND-II (33C) - Improvement to Two Lane with Earthen shoulder for Loha , Gopi Tanda , Dhanora , Bembar , Jambhali to NH-161A MDR-107 , Km 0/00 to 27/00 Tal . Bhokar Dist . Nanded on EPC mode||||EPC ND-II (33C) - Improvement to Two Lane with Earthen shoulder for Loha , Gopi Tanda , Dhanora , Bembar , Jambhali to NH-161A MDR-107 , Km 0/00 to 27/00 Tal . Bhokar Dist . Nanded on EPC mode INDIA MAHARASHTRA 1159669513 Details
5003603735
Not Specified Survey , Soil Investigation , Design and Execution of various works for augmentation of water supply system including Providing , Laying , Jointing , Testing and Commissioning of Clear water Gravity pipeline of diameter 2235 mm and length of 38850 mtr||||Survey , Soil Investigation , Design and Execution of various works for augmentation of water supply system including Providing , Laying , Jointing , Testing and Commissioning of Clear water Gravity pipeline of diameter 2235 mm and length of 38850 mtr INDIA MADHYA PRADESH 4242018000 Details

Back Page 59 of 581
( 5809 records )
Next
....   54    55    56    57    58    59    60    61    62    63    64  ....