Download AllTenders App for Free!
Enter Mobile to get link to Download the App

AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5002144034 |
23-Oct-2023 | Improvement and Up gradation to 4 Lane with P/S configuration from Existing Km . 0 . 000 to Km . 39 . 500 Design Ch 0 . 500 to Ch 40 . 342 Design length 40 . 842 Km of NH 227A near Mehrauna Ghat UP Bihar Border to Siwan in the state of Bihar on HAM Mode||||Improvement and Up gradation to 4 Lane with P/S configuration from Existing Km . 0 . 000 to Km . 39 . 500 Design Ch 0 . 500 to Ch 40 . 342 Design length 40 . 842 Km of NH 227A near Mehrauna Ghat UP Bihar Border to Siwan in the state of Bihar on HAM Mode | INDIA | BIHAR | 7217800000 | Details | ||
5002131212 |
Not Specified | DEVELOPMENT OF SOLAR POWER PLANTS UNDER KUSUM-C SCHEME (SUB-DIVISION- LOHAWAT AND BAPINI OF DIVISION PHALODI UNDER JODHPUR DISTRICT CIRCLE)||||Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant | INDIA | RAJASTHAN | 7550200000 | Details | ||
5002142919 |
11-Oct-2023 | Rehabilitation and Up-gradation to Four Laning of NH-31D from Km . Ch . 83 . 340 to Km . Ch . 113 . 200 (Package-II B) of Dhupguri to Falakata Section in the State of West Bengal on EPC Mode||||Rehabilitation and Up-gradation to Four Laning of NH-31D from Km . Ch . 83 . 340 to Km . Ch . 113 . 200 (Package-II B) of Dhupguri to Falakata Section in the State of West Bengal on EPC Mode | INDIA | DELHI (U.T.-NCT) | 7990500000 | Details | ||
5002144024 |
28-Oct-2023 | Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV , Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering , Procurement and Construction (EPC) basis . ||||Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV , Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering , Procurement and Construction (EPC) basis . | INDIA | UTTAR PRADESH | 8080800000 | Details | ||
5002131226 |
Not Specified | DEVELOPMENT OF SOLAR POWER PLANTS UNDER KUSUM-C SCHEME (SUB-DIVISION- AAU AND BAP OF DIVISION PHALODI UNDER JODHPUR DISTRICT CIRCLE)||||Design _survey_installation_commissioning_ 25 yrs_ O_M from COD of grid connected SPP through RESCO Mode _its associated line_33 or 11 KV to connect plant to 33_11 kv substation__RMS of Solar Power plant | INDIA | RAJASTHAN | 8166900000 | Details | ||
5002143421 |
Not Specified | Construction of Additional structures including approaches in Vadodara Surat section of NH48 between existing Km . 108 . 000 to Km . 250 . 000 in the State of Gujarat on EPC Mode||||Construction of Additional structures including approaches in Vadodara Surat section of NH48 between existing Km . 108 . 000 to Km . 250 . 000 in the State of Gujarat on EPC Mode | INDIA | DELHI (U.T.-NCT) | 8595300000 | Details | ||
5002142801 |
Not Specified | Widening to four lane with paved shoulder of NH 548 B from Km 118 . 450 Near Shirguppi to Km 128 . 450 Near Ankali in the State of Karnataka||||Widening to four lane with paved shoulder of NH 548 B from Km 118 . 450 Near Shirguppi to Km 128 . 450 Near Ankali in the State of Karnataka | INDIA | KARNATAKA | 8872300000 | Details | ||
5002143410 |
Not Specified | 1065/MPMRCL/2023/Package BH-04 Design Construction of Twin Tunnel Cut Cover Cross passages with OR without sump Ramps two UG Stations including Architectural finishing Water Supply Sanitary Installation and Drainage works in entire UG||||Design Construction of Twin Tunnel Cut Cover Cross passages with OR without sump Ramps two UG Stations including Architectural finishing Water Supply Sanitary Installation and Drainage works in entire UG from CH 28375 to 31765 for Bhopal Metro | INDIA | MADHYA PRADESH | 8920000000 | Details | ||
5002143414 |
Not Specified | Upgradation/Strengthening of Existing 2Lane Carriageway to 4Lane Divided Carriageway from 161 . 000 (Existing Km . 484 . 300) in Jitnagar in Nandod Taluka to 179 . 780 (Existing Km . 506 . 660) in Bitada/Movi in Netrang Taluka of NH56 in Gujarat on HAM PKG 4B||||Upgradation/Strengthening of Existing 2Lane Carriageway to 4Lane Divided Carriageway from 161 . 000 (Existing Km . 484 . 300) in Jitnagar in Nandod Taluka to 179 . 780 (Existing Km . 506 . 660) in Bitada/Movi in Netrang Taluka of NH56 in Gujarat on HAM PKG 4B | INDIA | DELHI (U.T.-NCT) | 9718500000 | Details | ||
5002126747 |
Not Specified | provide the consultancy services for Architect cum Consultant (including PMC) for Development of Mata Shri Chintpurni Temple Distt . Una(H . P)||||provide the consultancy services for Architect cum Consultant (including PMC) for Development of Mata Shri Chintpurni Temple Distt . Una(H . P) | CONSULTANCY | INDIA | HIMACHAL PRADESH | 1000000000 | Details |
Back |
Page 423 of 581 ( 5809 records ) |
Next |
.... 418 419 420 421 422 423 424 425 426 427 428 .... |