Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5002559184 |
Not Specified | Work of development and construction of elevated corridor from km 38/660 to km 42/690 (from Iscon Junction to Start point of approach of Sanand Flyover) of NH-147 in the State of Gujarat . ||||Work of development and construction of elevated corridor from km 38/660 to km 42/690 (from Iscon Junction to Start point of approach of Sanand Flyover) of NH-147 in the State of Gujarat . | INDIA | GUJARAT | 4528400000 | Details | ||
5002559110 |
15-Dec-2023 | NHIDCL/Mizoram/ PATSC/NH-6/VS(P-7)/2023-24||||Construction Four laning of N . Kawnpui (N . Mualvum) - West Serawlg section (Package-7) of NH-6 from Silchar - Vairengte - Sairang road in the State of Mizoram | INDIA | MIZORAM | 4954400000 | Details | ||
5002559243 |
Not Specified | Rehabilitation , Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane/2LPS of NH 965DD from Lonand Shirval-Bhor Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border in the state of Maharashtra . ||||Rehabilitation , Upgradation and Widening of existing Highway to Rigid Pavement 2 Lane/2LPS of NH 965DD from Lonand Shirval-Bhor Mandangad-Pachral Section Shindewadi Phata to Varandha Ghat Dist Border in the state of Maharashtra . | INDIA | MAHARASHTRA | 4961350000 | Details | ||
5002559104 |
15-Dec-2023 | NHIDCL/Mizoram/PATSC/ NH-6/VS(P-8)/2023-24||||Construction Four laning of West Serawlg-Sairang section (Package-8) of NH-6 from on Silchar - Vairengte - Sairang road in the State of Mizoram | INDIA | MIZORAM | 5036300000 | Details | ||
5002555123 |
Not Specified | Excavation , loading of Pond ash from Ash dyke/Silos of SSTPP , Dongaliya , transportation and unloading at construction site of 4 lanning of Raghogarh to Nanasa section of NH-47 under Bharat Mala Pariyojna Phase-I Economic Corridor in the state of M . P . ||||Excavation , loading of Pond ash from Ash dyke/Silos of SSTPP , Dongaliya , transportation and unloading at construction site of 4 lanning of Raghogarh to Nanasa section of NH-47 under Bharat Mala Pariyojna Phase-I Economic Corridor in the state of M . P . | INDIA | MADHYA PRADESH | 6302127000 | Details | ||
5002559152 |
Not Specified | Construction of four lane of Chausa Buxar Bypass from km 45 . 000 to km 65 . 915 (Package-2) of NH-319A in the state of Bihar on EPC mode||||Construction of fourlane of Chausa Buxar Bypass from km 45 . 000 to km 65 . 915 (Package-2) of NH-319A in the state of Bihar on EPC mode | INDIA | DELHI (U.T.-NCT) | 6324500000 | Details | ||
5002550421 |
01-Jan-2024 | Four laning of Kereya to Keyondpani section of NH 143D starting from Km 28 . 953 (Design chainage) to Km 59 . 300 (Design chainage) (Length 30 . 347 km) on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana in Jharkhand (Package II)||||Four laning of Kereya to Keyondpani section of NH 143D starting from Km 28 . 953 (Design chainage) to Km 59 . 300 (Design chainage) (Length 30 . 347 km) on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojana in Jharkhand (Package II) | INDIA | DELHI (U.T.-NCT) | 6562500000 | Details | ||
5002550173 |
20-Dec-2023 | Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140 . 960 (Patranga) to Km 160 . 200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh||||Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140 . 960 (Patranga) to Km 160 . 200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh | INDIA | UTTAR PRADESH | 6886700000 | Details | ||
5002552122 |
29-Nov-2023 | 4Laning of Chowka to Kaimaha near MP/UP Border sec NH34 form Design Ch145 . 000 to Design Ch197 . 266 excluding existing Chhatarpur bypass from Design Ch . 160 . 307 to Design Ch . 168 . 630 (PkgIV)||||4Laning of Chowka to Kaimaha near MP/UP Border sec NH34 form Design Ch145 . 000 to Design Ch197 . 266 excluding existing Chhatarpur bypass from Design Ch . 160 . 307 to Design Ch . 168 . 630 (PkgIV) | INDIA | DELHI (U.T.-NCT) | 6886700000 | Details | ||
5002552115 |
29-Nov-2023 | 4Laning of near Satai ghat to Chowka sec NH34 from D . Ch . 89 . 875 to DCh . 145 . 000 (Total Length 55 . 125 kms) in the State of Madhya Pradesh (PKG3) on HAM . ||||4Laning of near Satai ghat to Chowka sec NH34 from D . Ch . 89 . 875 to DCh . 145 . 000 (Total Length 55 . 125 kms) in the State of Madhya Pradesh (PKG3) on HAM . | INDIA | DELHI (U.T.-NCT) | 7174000000 | Details |