AllTenders - Serving clients online since Jan, 2000            Sales: 9313852989, 9355399771

franchise

Liaison Support

Tenders that match your criteria


Ref. No. Active Till Name of Work Category Sub Category Country State Estimated Cost (Rs.) Details
5003342528
Not Specified Rehabilitation and Uppradation of Shewali Fata to Kalambhir Section i . e km 0/443 to km 4/500 Nizampur to Chadwel section i . e . km 13/482 to 26/265 of NH-753B 2 Lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Mode . ||||Rehabilitation and Uppradation of Shewali Fata to Kalambhir Section i . e km 0/443 to km 4/500 Nizampur to Chadwel section i . e . km 13/482 to 26/265 of NH-753B 2 Lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Mode . INDIA MAHARASHTRA 1203925469 Details
5003342532
Not Specified Rehabilitation and Up gradation of Pathri Selu Deogaon Phata from Borgavhan to Selu Design Ch Km . 47 900 to Km 62 800 and from Digras Phata to Deogaon Phata Design Ch Km 68 700 to Km 83 700 section of Injegaon Sonpeth Pathri Selu Deogaon Phata ro||||Rehabilitation and Up gradation of Pathri Selu Deogaon Phata from Borgavhan to Selu Design Ch Km . 47 900 to Km 62 800 and from Digras Phata to Deogaon Phata Design Ch Km 68 700 to Km 83 700 section of Injegaon Sonpeth Pathri Selu Deogaon Phata ro INDIA MAHARASHTRA 2541843696 Details
5003343036
Not Specified Four laning of Dhrol Greenfield section from Km 0 . 000 (Ex Ch . 53 . 151 of SH-25) to Km 3 . 286 and Widening to four lane from Km3 . 286-Km6 . 000 and Widening of Amran section to 4 lane from Km 42 . 180-Km48 . 580 of NH-151A under NH(O) in Gujarat on EPC mode||||Four laning of Dhrol Greenfield section from Km 0 . 000 (Ex Ch . 53 . 151 of SH-25) to Km 3 . 286 and Widening to four lane from Km3 . 286-Km6 . 000 and Widening of Amran section to 4 lane from Km 42 . 180-Km48 . 580 of NH-151A under NH(O) in Gujarat on EPC mode INDIA DELHI (U.T.-NCT) 4156100000 Details
5003343028
22-Feb-2024 Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102 . 000 to design km 142 . 357 (Design length 40 . 357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode||||Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102 . 000 to design km 142 . 357 (Design length 40 . 357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode INDIA DELHI (U.T.-NCT) 6136200000 Details
5003342466
22-Feb-2024 Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV , Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering , Procurement and Construction (EPC) basis . ||||Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV , Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering , Procurement and Construction (EPC) basis . INDIA UTTAR PRADESH 8080800000 Details
5003343030
Not Specified Construction of Integrated Terminal Building , Cargo Terminal , ATC Tower cum Technical Block , Fire Station Building with Fire Control Tower including Ancillary Buildings like Office Building , Maintenance Building , Security Building , Sub-Station etc . ||||Construction of Integrated Terminal Building , Cargo Terminal , ATC Tower cum Technical Block , Fire Station Building with Fire Control Tower including Ancillary Buildings like Office Building , Maintenance Building , Security Building , Sub-Station etc . INDIA HARYANA 5037100000 Details
5003343013
22-Feb-2024 Const work of 4laning of Budhni to Badi sec of NH146B from design km 82 . 882 to design km 150 . 712 (Design Length 67 . 83 km) under NH(O) in the State of Madhya Pradesh on HAM . ||||Const work of 4laning of Budhni to Badi sec of NH146B from design km 82 . 882 to design km 150 . 712 (Design Length 67 . 83 km) under NH(O) in the State of Madhya Pradesh on HAM . INDIA DELHI (U.T.-NCT) 8708000000 Details
5003343008
21-Feb-2024 Development of 4 lane Economic Corridor from Kharagpur to Chandrakona Ghatal Road Crossing sec Km0 . 000 to Km 41 . 000 of NH 116A (PKG I) in the state of West Bengal under HAM Mode . ||||Development of 4 lane Economic Corridor from Kharagpur to Chandrakona Ghatal Road Crossing sec Km0 . 000 to Km 41 . 000 of NH 116A (PKG I) in the state of West Bengal under HAM Mode . INDIA DELHI (U.T.-NCT) 9848600000 Details
5003343021
21-Feb-2024 Six laning of existing 4-lane section from Gonde (km . 439 . 038) to Pimpri Sado (km . 459 . 905) section of NH-848 (Old NH-3) (Design length 19 . 712 km . ) under NH(O) in the state of Maharashtra on Hybrid Annuity Mode||||Six laning of existing 4-lane section from Gonde (km . 439 . 038) to Pimpri Sado (km . 459 . 905) section of NH-848 (Old NH-3) (Design length 19 . 712 km . ) under NH(O) in the state of Maharashtra on Hybrid Annuity Mode INDIA DELHI (U.T.-NCT) 6704500000 Details
5003342470
Not Specified Construction of 6 no . of Mangobandhar , Kendua , Tolesono , Jhajha , Narganjo and Bhairoganj Bypasses (Total Length-19 . 450km) along with 2 no . of DLP free Sections (total length-21 . 821 Km) to two lane with paved shoulders standard in State of Bihar||||Construction of 6 no . of Mangobandhar , Kendua , Tolesono , Jhajha , Narganjo and Bhairoganj Bypasses (Total Length-19 . 450km) along with 2 no . of DLP free Sections (total length-21 . 821 Km) to two lane with paved shoulders standard in State of Bihar INDIA DELHI (U.T.-NCT) 4144200000 Details

Back Page 143 of 581
( 5809 records )
Next
....   138    139    140    141    142    143    144    145    146    147    148  ....