Download AllTenders App for Free!
Enter Mobile to get link to Download the App

AllTenders - Serving clients online since Jan, 2000 Sales: 9313852989, 9355399771
Ref. No. | Active Till | Name of Work | Category | Sub Category | Country | State | Estimated Cost (Rs.) | Details |
---|---|---|---|---|---|---|---|---|
5003366215 |
Not Specified | Operation and Maintenance Contract of QC Laboratory (Refinery) and QC Laboratory (Petrochemical Section) of IOCL Paradip Refinery and Petrochemical Complex , Paradip Odisha , India||||Operation and Maintenance Contract of QC Laboratory (Refinery) and QC Laboratory (Petrochemical Section) of IOCL Paradip Refinery and Petrochemical Complex , Paradip Odisha , India | SERVICES | INDIA | ORISSA | 2818039106 | Details | |
5003361870 |
Not Specified | Engagement of an Agency (SI) for Design , Engineering , manufacture , Supply , wiring , Installation , Testing , Commissioning of Hardware , Software for implementation and operational support of Substation Data Acquisition and Control (SDAC) System||||and its Integration with other Systems and Associated Works at MPPKVVCL , Indore , under RDSS scheme | INDIA | MADHYA PRADESH | 1600000000 | Details | ||
5003363921 |
Not Specified | Request for Proposal (RFP)/Tender Document For Onboarding System Integrator (SI) to Implement Threat Detection and Incident Response Tools||||Request for Proposal (RFP)/Tender Document For Onboarding System Integrator (SI) to Implement Threat Detection and Incident Response Tools | INDIA | MAHARASHTRA | 3000000000 | Details | ||
5003361566 |
08-Mar-2024 | CONSTRUCTION OF IT PARK AT TURA , WEST GARO HILLS DISTRICT ON EPC MODE , MEGHALAYA||||CONSTRUCTION OF IT PARK AT TURA , WEST GARO HILLS DISTRICT ON EPC MODE , MEGHALAYA | INDIA | MEGHALAYA | 1269400000 | Details | ||
5003363892 |
Not Specified | Outright Purchase Lease for 28 Years of Land up to 1000 Acres with all requisite statutory clearances inclusive of chain link fencing around the periphery of the Land obtaining connectivity with STU for setting up Solar Power Project up to 200MW||||Outright Purchase Lease for 28 Years of Land up to 1000 Acres with all requisite statutory clearances inclusive of chain link fencing around the periphery of the Land obtaining connectivity with STU for setting up Solar Power Project up to 20 | INDIA | HIMACHAL PRADESH | 2000000000 | Details | ||
5003361565 |
Not Specified | Construction of Unity Mall and Infrastructure in the New Shillong Township , Shillong , Meghalaya||||Construction of Unity Mall and Infrastructure in the New Shillong Township , Shillong , Meghalaya | INDIA | MEGHALAYA | 2150000000 | Details | ||
5003353559 |
01-Apr-2024 | Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35 . 550 Design Chainage 0 . 000 to 42 . 800 Design Chainage 8 . 153 on NH 503A including Cable Stayed Bridge 0 . 860 Km on Back Water of Govind Sagar||||Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35 . 550 Design Chainage 0 . 000 to 42 . 800 Design Chainage 8 . 153 on NH 503A including Cable Stayed Bridge 0 . 860 Km on Back Water of Govind Sagar | INDIA | HIMACHAL PRADESH | 6136885046 | Details | ||
5003354235 |
Not Specified | Reconstruction Widening Strengthening of Belhe Shirur from Single Lane Intermediate Lane and Two lane to Two lane with paved Shoulders of NH-761 from Design Ch . Km 0 . 000 to KM 37 . 970 Design length 37 . 970 Km in the State of Maharashtra on EPC Mode||||Reconstruction Widening Strengthening of Belhe Shirur from Single Lane Intermediate Lane and Two lane to Two lane with paved Shoulders of NH-761 from Design Ch . Km 0 . 000 to KM 37 . 970 Design length 37 . 970 Km in the State of Maharashtra on EPC Mode | INDIA | MAHARASHTRA | 2511729214 | Details | ||
5003354212 |
Not Specified | Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54 . 000 to 82 . 300 and Design chainage km 54 . 000 to 82 . 120 Shikrapur to Nhavara Section to 2L PS . 4L Configuration in the State of Maharashtra on||||Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH - 548 D from existing chainage km 54 . 000 to 82 . 300 and Design chainage km 54 . 000 to 82 . 120 Shikrapur to Nhavara Section to 2L PS . 4L Configuration in the State of Maharashtra on | INDIA | MAHARASHTRA | 2767962992 | Details | ||
5003354108 |
Not Specified | Capital Dredging Phase VI||||Capital Dredging phase VI to provide deep draft at Kamarajar Port | INDIA | TAMIL NADU | 3800000000 | Details |
Back |
Page 140 of 581 ( 5809 records ) |
Next |
.... 135 136 137 138 139 140 141 142 143 144 145 .... |